EPICS Home

Experimental Physics and Industrial Control System


 
2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  <20232024  Index 2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  <20232024 
<== Date ==> <== Thread ==>

Subject: Build completed: EPICS Base 7 base-7.0-926
From: AppVeyor via Core-talk <core-talk at aps.anl.gov>
To: core-talk at aps.anl.gov
Date: Fri, 12 May 2023 07:13:31 +0000

Build EPICS Base 7 base-7.0-926 completed

Commit 7fb13b04fe by Karl Vestin on 5/10/2023 6:35 AM:
Changed number in test_l_flag to positive

Configure your notification preferences


Navigate by Date:
Prev: Build failed: EPICS Base 7 base-7.0-927 AppVeyor via Core-talk
Next: Jenkins build is back to normal : epics-base-3.15 #570 APS Jenkins via Core-talk
Index: 2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  <20232024 
Navigate by Thread:
Prev: Build failed: EPICS Base 7 base-7.0-927 AppVeyor via Core-talk
Next: Build failed: EPICS Base 7 base-7.0-928 AppVeyor via Core-talk
Index: 2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  <20232024