RF Window Test Overview
 | 350 MHz Windows
|
 | Test stand originally developed at Argonne
 | Primary LabView system (Macintosh)
 | RGA LabView system (PC)
 | A/B PLC-5
| | | |
 | Interface to High Voltage Power Supply and Klystron
|
 | Conditioned 14 Windows to 1 MW, with 4
|
more to be conditioned ~30-APR-1998
 | Ran at 1 MW for 3 to 4 hours
|
 | Average time to 1 MW was 18.5 hrs. with a standard deviation of 7.1 hrs. (max = 39 hrs., min = 13 hrs.)
|
 | All tests used EPICS interface and data archiving
|
|