Experimental Physics and Industrial Control System
Text item: Text_1
All,
I would appreciate it very much if you would make this job opening known to
qualified candidates - thank you
rick
=====================================================================
Position: Real Time Software Engineer
The Gemini 8-m Telescopes Project has the responsibility for the
design, construction, installation and commissioning of two
state-of-the-art 8 meter optical/infrared telescopes located on Mauna
Kea, Hawaii and Cerro Pachon, Chile. This fully funded project is an
international collaboration between the United States, United Kingdom,
Canada, Chile, Argentina and Brazil.
As part of the Gemini Controls Team you will be responsible for all
aspects of real-time computing. To qualify for this position you must
have:
z a degree in electrical or software engineering or a degree plus at
least 4 years related experience
z significant experience in real-time control systems
z demonstrated ability using Wind River Systems' VxWorks
z familiarity with EPICS (Experimental Physics and Industrial Control
System) or a demonstrated ability to learn new systems quickly
z ability to work at the summit of Mauna Kea (altitude 14,000 feet)
You will be faced with the challenge of providing support to a
distributed group of developers as well as taking responsibility for
the design, coding and maintenance of our in house real-time systems.
You will also have the opportunity to relocate to Hilo, Hawaii and La
Serena, Chile. Although the position ends in 2001 it is expected that
most employees will have the opportunity to transition to the
operations teams at one of the two telescope sites.
Candidates will be employees of AURA, who provide an excellent
compensation and benefits package including 24 days annual vacation.
We act affirmatively to employ women, minority group members, and
protected classes of handicapped persons, disabled veterans of the
Vietnam Era; to be considered, let us know. Please send a resume and
names of three professional references by June 30, 1995 to:
R.J.McGonegal
Controls Manager
The Gemini 8-m Telescopes Project
P.O. Box 26732
Tucson, AZ 85726
[email protected]
[electronic mail submissions are preferred if possible]
- Navigate by Date:
- Prev:
Analog Output Record Bug Bob Dalesio
- Next:
Re: application directories and CVS, GNU make etc Marty Kraimer
- Index:
1994
<1995>
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
Analog Output Record Bug Bob Dalesio
- Next:
Real-Time Software Engineer Position mcgehee
- Index:
1994
<1995>
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024