> While we're on the subject of changing record definitions... Has it occurred to
> anybody else how much nicer life would be if the calc record had an output
> link?
>
> Eric Bjorklund
> LANSCE Operations
>
Prior to EPICS release 3.13, we used a "WAIT" record here at ANL (which is
included in base and documented in the Record Reference Manual) that was
very much like a calc record with the following added features :
- an output link that was "conditionally" executed. Options included
Execute Output Link ...
- every time the record processed
- when val changes
- when val = 0
- when val != 0
- when val transitions to 0
- when val transitions to non-zero
- Input and output links were not real PV_LINKs, they were text strings
that contained PV names that a caClient (running in the database) would
connect to. This made the input links "dynamic", i.e. they could be
changed on the fly without rebooting. The library that supported this
is included in base as recDynLink (3.12.2) or recWaitCa (3.12.1.x). It
also made it possible to process the record when an input value changed,
which was very desirable.
- There is also a programmable delay from when the record processes
to when the output link was executed.
- Optionally, a software EVENT could be posted instead of (or in addition
to) the output link being executed.
Starting with R3.13, ALL PV_LINKs are "reassignable" on the fly, so much of
the "novelty" of recDynLink has been incorporated into standard EPICS. In
an attempt to make recDynLink go away some day, a calcAo record was written
in an attempt to merge the capabilities of the WAIT record and the CALC record.
Currently, the calcAo record is not in R3.13 base, it is in our SHARE directory.
It has the above mentioned features of the WAIT record PLUS
- a second calculation field used to <optionally> output a
separately calculated value to the output link. The first calculation
determines whether the output link will be processed, the second
derives the output data to use.
- Input links are standard PV_LINKs, compatible with currently
defined CALC records, but also are reassignable and can cause the
record to process when the input value changes (CP attribute of
the PV_LINK).
- Adds the option of what to do with the output link if the alarm
severity is INVALID (like the AO record).
What we would like feedback on is this ...
Should the calcAo record ...
- be added to base in R3.13 ?
- replace the CALC record in R3.13 ? (to minimize "similar" records)
- be made available to only those that politely ask for it ?
Ned
- Navigate by Date:
- Prev:
Odd behavior in snc 1.8.3 Peregrine McGehee
- Next:
Re: mbbiDirect and mbboDirect changes in r3.13x Mark S. Engbretson
- Index:
1994
1995
1996
<1997>
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
RE: mbbiDirect and mbboDirect changes in r3.13x Eric Bjorklund, NPSM
- Next:
Re: mbbiDirect and mbboDirect changes in r3.13x Mark S. Engbretson
- Index:
1994
1995
1996
<1997>
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024