Experimental Physics and Industrial Control System
The Controls Department at SLAC has an opening for the position of Deputy Project Manager for LCLS Controls. The LCLS project at SLAC is constructing the world's first X-ray Free electron Laser (FEL). The control system is based on EPICS, and the scope of our responsibility ranges from the injector to the detectors and the experimental end station.
If you are interested please see the position description and requirements on the SLAC web at:
http://www-public.slac.stanford.edu/hr/jobs/jobdetail.asp?REQID=030445
Thanks,
--Hamid
--------------------------
Hamid Shoaee
Controls Department
Stanford Linear Accelerator Center
Office: 650-926-3535
Cell: 650-862-2598
- Navigate by Date:
- Prev:
RE: Problems with Channel Access calls on an IOC moving from R3.13.7 -> 3.14.8 Jeff Hill
- Next:
-- Device support and driver for ICV196 R3.14.8.2 -- jerome HOSSELET
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
RE: Problems with Channel Access calls on an IOC moving from R3.13.7 -> 3.14.8 Jeff Hill
- Next:
-- Device support and driver for ICV196 R3.14.8.2 -- jerome HOSSELET
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024