EPICS Home

Experimental Physics and Industrial Control System


 
1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Group Leader Position open at the LINAC Coherent Light Source at SLAC
From: "Dalesio, Leo `Bob`" <[email protected]>
To: "EPICS Tech Talk" <[email protected]>
Date: Wed, 22 Jun 2005 13:53:55 -0700
We have an outstanding control system group and an exciting project that is in search of a control system group leader. The control system includes all electronics from the connection to the mechanical devices - through beam steering and automation. If you are interested, please read on at the SLAC web site:

http://www-public.slac.stanford.edu/hr/jobs/jobdetail.asp?REQID=030228


Navigate by Date:
Prev: RE: Hytec DAC8402 DAC Register Write Problem Liyu, Andrei
Next: question about Channel Archiver huangsong
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: RE: Hytec DAC8402 DAC Register Write Problem Liyu, Andrei
Next: question about Channel Archiver huangsong
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024