EPICS Home

Experimental Physics and Industrial Control System


 
1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
<== Date ==> <== Thread ==>

Subject: Open Position in Hawaii at Gemini/NOIRLab
From: Matt Rippa via Tech-talk <tech-talk at aps.anl.gov>
To: Talk EPICS Tech <tech-talk at aps.anl.gov>
Date: Sat, 3 Sep 2022 14:59:51 -1000
Hi folks,

We have an open position for a software engineer in our telescope controls group. This position is located in Hawaii and will be open until filled.

https://bit.ly/REALT004171

If you're interested in either starting or finishing your career with these attributes:
Let's talk. 

Cheers,
Matt



Navigate by Date:
Prev: Re: error while building asyn4-38 in Rocky Mark Rivers via Tech-talk
Next: Re: PVs in galil-3-6 Mark via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
Navigate by Thread:
Prev: Re: error while building asyn4-38 in Rocky Mark Rivers via Tech-talk
Next: 'CAS-client' failed in ../db/dbEvent.c line 540 Makarov, Oleg A. via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024