Hi Ralph
Thanks for your input. I can use that with management.
The issue is Time and manpower :)
With an observatory, which has: 2 telescopes; 12 instruments; and
multiple adaptive optic and interferometric modes, regression testing
can take any where up to a year, as one must wait for each telescope
configuration to occur. We typically only do upgrades on engineering
nights (there are very few in any given year) and some configurations
never occur on engineering nights. Those configurations would have to be
specifically requested (with an all night plan in place). That makes it
hard to deploy anything that affects all systems, as would be the case
with an EPICS version upgrade. We can do some partitioning of releases
(e.g. deploy for the telescope drive systems independently on each
telescope, then the AO systems,...) = but it is still a tough nut.
Thanks,
Al