Hi Andrew,
I like your new approach and think that your timetable is reasonable at
least for me.
Thanks,
Ernest L. Williams Jr.
SNS Control Systems Group
ORNL
On Wed, 2006-10-25 at 16:24 -0500, Andrew Johnson wrote:
> Hi folks,
>
> We think it's about time for another release of the R3.14 branch of
> Base, which will be numbered 3.14.9. For this release I want to tag one
> Pre-release version at feature-freeze, followed by as many weekly
> Release Candidate versions as are needed to try and avoid the little
> bugs that last time caused us to have to subsequently release versions
> 3.14.8.1 and 3.14.8.2.
>
> Here's what I'm proposing:
>
> 1. All new features and architectures to be committed by 2006-11-20
> (feature freeze).
> 2. Tag CVS with R3-14-9-pre1 at that time, and generate a tar file.
> 3. Encourage testing on as many architectures as possible, and accept
> build and bug fixes to until 2006-12-01.
> 4. Tag CVS with R3-14-9-RC1, and generate a tar file for wide-scale testing.
> 5. If problems are found in this -RCn version, 7 days after the previous
> -RCn was released (i.e. on 2006-12-08, 2006-12-15 etc.) tag the result
> with the next -RCn value, generate another tar file, lather, rinse and
> repeat.
> 6. If no problems are reported with an -RCn version in 7 days, tag and
> release the latest R3-14-9-RCn version as R3.14.9.
>
> Can I get a first reaction to this proposal and timescale from at least
> the following key people, without whose co-operation the release will
> not be possible:
> Jeff Hill (Channel Access, Win32)
> Ralph Lange (HP-UX)
> Eric Norum (RTEMS, MacOS)
> Janet Anderson (Build system, Win32)
> Ernest Williams (vxWorks 6.x, Linux-x86_64)
>
> If you are not named above and have ported EPICS to an architecture that
> R3.14.8.2 does not support for which you are willing to donate patches
> and perform testing, please feel free to include your comments on this
> timescale.
>
> Thanks,
>
> - Andrew
- Replies:
- Re: Timetable for R3.14.9? Benjamin Franksen
- References:
- Timetable for R3.14.9? Andrew Johnson
- Navigate by Date:
- Prev:
Timetable for R3.14.9? Andrew Johnson
- Next:
Re: Timetable for R3.14.9? Benjamin Franksen
- Index:
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
Timetable for R3.14.9? Andrew Johnson
- Next:
Re: Timetable for R3.14.9? Benjamin Franksen
- Index:
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
|