EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Next Collaboration Meeting (etc...) Oct. 30th to Nov. 8th
From: [email protected] (Bob Dalesio)
To: [email protected], [email protected]
Date: Thu, 21 Sep 95 10:03:25 MDT
  
  I am attaching a preliminary agenda for the next collaboration meeting.
  
  Note that the Saturday session was moved to Tuesday. This is expected
  to be a working session. Results required.
  
  Also not that I need some more topics for the Monday and Tuesday meetings.
  Anyone have something of general interest? I know there are a number of
  archive viewers being done - what about the tools at CEBAF (correlation plots..)
  Anyone have any performance numbers - runtime problems - porting issues -
  release information - extensions to talk about?????
  
  
  Bob






  Next Collaboration Meeting: Preliminary
  
  This agenda has three parts:
  EPICS Meeting Times and Topics
  ICALEPCS Talks related to EPICS
  Notes on the other meetings - software sharing meeting on Saturday & database meeting
  
  This meeting is held in conjunction with the:
  International Conference on Accelerator and Large Experimental Physics Control
  Systems (ICALEPCS). This meeting will be help in Chicago. A portion of it
  will be covered in the ICALEPCS proceedings - much of the work
  being performed will be presented here.
  
  There is no fee to attend and all evenning activities are optional.
  
  
  
  EPICS Agenda (with place holders for other meetings) - this needs some more material - any 
  		interested persons????? CEBAF tools?????? PLanned Observing?????
  PLEASE CONTACT ME TO BE PLACED ON THE AGENDA. THANKS.
  Mon: ICALEPCS
  Tuesday: (In place of the ICALEPCS Tours - we will need a small room at the Swissotel)
  	Archiver Functional SPecs and Design Ideas
  	Channel Access V4 / Portable Server / CDEV vs. CA Client
  	Online Add and Delete - modifiable address fields
  Wed: ICALEPCS
  Thur: ICALEPCS
  Fri: ICALEPCS
  Sat: Software sharing - at the Swissotel - CDEV talk is part of this
  Sun:
  Monday Morning: - at Argonne
  	PSR upgrade - design / fallback / lessons learned
  	Facts - details - problems - advice - in applications
  Monday Afternoon: - at Argonne
  	Strip Tool
  	EDD/DM status
  Tuesday: - at Argonne
  	Save, Restore, and Warm Reboot
  	Solicitation for talk on Universal Application Environment
  
  
  
  Mon-Wed. Also has the database meeting for the CERN working group -
  For ICALECPS, Database and Software sharing groups - 
  	see:  http://www.aps.anl.gov/icalepcs95/ICALEPCS_agenda.html
  
  
  ICALEPCS Talks - relating to EPICS:
  No information on the Posters that may be of interest.
  Monday Afternoon -
  	McDowell?/Dalesio? - Panel Discussion of EPICS
  		2:00 forum that we need to organize
  	Lenkszus - The Advanced Photon SOurce Event System
  	Kowalkowski - An Object-Oriented Approach to Low Level 
  			Instrumentation Control and Support
  Tuesday -
  	Tour of Argonne - one of the two large EPICS installations
  Wednesday Monring -
  	Hill - A server Level API for EPICS
  	McGonegal - The Gemini Control System
  	Lupton - Use of EPICS for Control of the Keck II Telescope
  	Rivers - Beamline Control and Data Acquisition in the APS
  Thursday Morning -
  	Control Theory Session
  	Software Engineering  Session
  Thursday Afternoon -
  	Dalesio - Distributed SOftware Developmetn in the EPICS Collaboration
  	Knott - Communication in SUpport of Software Sharing and Collab. Development
  	Borland - Doing Accelerator Physics with SDDS, UNIX, and EPICS
  	Clausen - Experience with Industrial Controls at DESY and Perspectives
  	Tang - A Comparative Study of Fuzzy Logic and Classical Control with EPICS
  	Akiyama - Intergration of Modeling Program with Accelerator Control Systems at TRISTAN
  	Chowdhary - A Fast Feedback System for CEBAF
  Friday Morning
  	Bickley - Management of Control System Data in an OO Database
  	


Replies:
Re: Next Collaboration Meeting (etc...) Oct. 30th to Nov. 8th watson

Navigate by Date:
Prev: Engineering Units Marty Kraimer
Next: Re: Next Collaboration Meeting (etc...) Oct. 30th to Nov. 8th watson
Index: 1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: Engineering Units Marty Kraimer
Next: Re: Next Collaboration Meeting (etc...) Oct. 30th to Nov. 8th watson
Index: 1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 10 Aug 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·