EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  <19961997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  <19961997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Need Volunteer with A4 Printer
From: [email protected] (Jackie Wallis)
To: [email protected]
Date: Fri, 10 May 1996 10:51:51 -0500
I would like to make our EPICS documents available in A4-Postscript
mode on the web pages.  But... I can't test the docs to see if they
work, since we don't have any A4 printers.  So, I need a volunteer
to print a short (4 page) file that I've generated to see if it works,
and if it doesn't work to help me trouble-shoot problems until I get
it working.  Any volunteers?

The URL is:
http://www.aps.anl.gov/~jwallis/TimingSysObs.a4.ps

Thanks,
Jackie Wallis
[email protected]


Navigate by Date:
Prev: Build Release R3.13.0.alpha3 Marty Kraimer
Next: R3.13.0.alpha3 is available Marty Kraimer
Index: 1994  1995  <19961997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Build Release R3.13.0.alpha3 Marty Kraimer
Next: R3.13.0.alpha3 is available Marty Kraimer
Index: 1994  1995  <19961997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 10 Aug 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·