Hi all,
Commissioning of the SLS storage ring started ahead of schedule (was
planed for Jan 2001) on Dec 11, when the booster to storage ring
transfer line was brought into operation.
On Dec. 13 first turn in the ring was achieved, and on Dec. 15 a stored
beam of 2.7 mAmp and 8.5 min lifetime was reached. Have a look at the
picture at www.sls.psi.ch/general/stored2.gif which was read via a VME
frame grabber and the Epics image record. On Dec 19th a 8 hour
lifetime (with relaxed optics) was achieved.
All major systems (RF, magnet power supplies, diagnostics, and vacuum)
are directly controlled by Epics, and worked without problems. The
machine control system consists of 104 iocs with a total of 82000 PVs.
Thanks to everyone in the Epics community who has supported the controls
team at here in making the SLS control system a success. Our work will
now shift to the SLS beam line controls, for which we also use Epics.
Steve Hunt
- Navigate by Date:
- Prev:
Re: How to configure the Capfast? shen guobao
- Next:
Fwd: ISAC Achieves Full Energy Beam. Dave Gurd
- Index:
1994
1995
1996
1997
1998
1999
<2000>
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
PMC and PC-MIP configuration for PowerPC Ernest L. Williams Jr.
- Next:
Fwd: ISAC Achieves Full Energy Beam. Dave Gurd
- Index:
1994
1995
1996
1997
1998
1999
<2000>
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
|