Experimental Physics and Industrial Control System
|
Hi all, The Australian Synchrotron currently has a vacancy for a controls engineer, this is a contract position of up to 12 months. The role is required to support the development of the Imaging and Medical Beamline in the areas of; motion controls, optimisation of fast CT scanning, integration of multi-mode detector systems, equipment and patient protection systems. The Imaging and Medical Beamline is the flagship of the Australian Synchrotron. It is our most ambitious project because of the wide range of imaging and computed tomography (CT) modalities we will offer our users and the scale of the works required to deliver the largest x-ray beam in the world (4cm by 50cm) to a satellite station equipped to handle large animals and clinical patients. Furthermore the facility is working towards the fastest implementations of clinical trials with live patients at any synchrotron facility worldwide and this brings significant technical challenges besides radiation safety, accurate dosimetry and all aspects of safe animal and patient handling. If you are interested or would like further information please feel free to contact me. Regards Lou Corvetti | Group Leader - Controls Engineering | Australian Synchrotron p: (03) 8540 4229 | f: (03) 8540 4200 | m: 0432 523 111 [email protected] | www.synchrotron.org.au 800 Blackburn Road, Clayton, Victoria 3168
This message and any attachments may contain proprietary or confidential information. If you are not the intended recipient or you received the message in error, you must not use, copy or distribute the message. Please notify the sender immediately and destroy the original message. Thank you. |
- Navigate by Date:
- Prev:
Re: application build error with new sequence program S. Stein
- Next:
Re: Change to RULES.Db between 3.14.8.2 and 3.14.11 -I../O.Common no longer in include paths Janet Anderson
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
<2011>
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
Re: application build error with new sequence program S. Stein
- Next:
pyepics: Strategies for working with fast-changing large arrays Anton Derbenev
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
<2011>
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
|
ANJ, 18 Nov 2013 |
·
Home
·
News
·
About
·
Base
·
Modules
·
Extensions
·
Distributions
·
Download
·
·
Search
·
EPICS V4
·
IRMIS
·
Talk
·
Bugs
·
Documents
·
Links
·
Licensing
·
|