EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: European Spallation Source - Software Engineer with EPICS
From: Sasu Roxana <[email protected]>
To: "'[email protected]'" <[email protected]>
Date: Wed, 3 Aug 2016 09:50:42 +0000

Dear Team,

 

My name is Roxana Sasu and I am a recruiter at Vitrociset Belgium company. I just wanted to send you a short e-mail and presenting the current vacancy that we have at the European Spallation Source in Lund, Sweden.

 

Here is a link to find more about it: https://www.space-careers.com/jobsearch/secompanystr__sekeywordsstr_vitrociset%20belgium_secontract_0_secountry__sesalarymin__sesalarymax__sesalarycurrency_dollar_sesalaryper_annum_seposted_28_sepage_1_seall_0_view_22542.html

 

If you can post this to your website so that other interested people with knowledge of EPICS can see it, I would be very grateful.

Thank you very much.

 

Below is the job description in case the link doesn’t work:

 

 

 

 

 

 

For this position (based at European Spallation Source, Lund), our client would like to acquire an engineer to support the Hardware and Integration Team in the development of EPICS integration for a number of different systems.

Please send your application to Ms Roxana Sasu at : [email protected]

 Contract: Permanent

Key Responsibilities:

 

·         Analysis and definition of requirements for control system components 

·         Architecture and design of control system components 

·         Implementation of control system components 

·         Testing of control system components 

·         Maintenance, support and improvement of delivered control system components

·         More specifically, the consultant shall support the ICS with the following type of services: 

·         Analysis and definition of requirements for the development of EPICS control systems for different applications. 

·         Development of EPICS device support, EPICS databases and HMIs for different applications. 

·         Testing of EPICS control systems for different applications 

·         Testing and documentation for the different developed control systems. 

·         The areas of services required in this Call-Off are: 

·         Control system hardware components 

·         EPICS device support and databases and HMIs 

·         The main responsibilities of the Consultant are collaboration in the EPICS integration of controls for the following applications: 

·         Neutron detector card controls design and implementation 

·         Neutron detector card timing and control demonstrator 

·         Trajectory support in the motion control IOC implementation and verification 

·         Gather requirements for Neutron Scattering System sample environment 

·         Beckhoff fast temperature data readout EPICS integration 

·         Detector power supply EPICS integration 

·         G02 and G01 systems EPICS integration. 

 

Requirements:

 

·         Knowledge of EPICS 

·         Experience with programming (C/C++, Java) and scripting (e. g. Python) languages 

·         Hands-on experience with control system hardware 

·         Experience with device integration, support and maintenance 

 

 

Kind Regards,

Roxana Sasu

___________________________

 

 

 

Description: cid:image001.jpg@01CC6308.AECAB470

 

 

 

 

Roxana Sasu

International Recruiter

 

Lise Meitner Strasse 10

D64293 Darmstadt.

Tel: +49(0)6151 9573416

Fax: +49(0)6151 9573426

Email: [email protected]

 

Visit us at: www.vitrocisetbelgium.com

 

ISO 9001:2008 certified company

 

P

Please consider your environmental responsibility before printing this page

 

DISCLAIMER

This email and any attached files are confidential and may be legally privileged. If you are not the addressee, any disclosure, reproduction, copying, distribution, or other dissemination or use of this communication is strictly prohibited. If you have received this transmission in error please notify the sender immediately and then delete this email. Email transmission cannot be guaranteed to be secure or error free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message which arise as a result of email transmission. If verification is required please request a hard copy version.

 

 


Navigate by Date:
Prev: Re: NDArrayPool::alloc failing Phil Atkin
Next: Open controls position at the Advanced Light Source, Berkeley Bob Gunion
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: PCASpy 0.6.2 Wang Xiaoqiang (PSI)
Next: Open controls position at the Advanced Light Source, Berkeley Bob Gunion
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 03 Aug 2016 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·