EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Group Leader position at ORNL
From: "Hartman, Steven M. via Tech-talk" <tech-talk at aps.anl.gov>
To: Tech-talk <tech-talk at aps.anl.gov>
Date: Tue, 31 Mar 2020 17:13:32 +0000
For the past 8+ years, I have been Group Leader for Instrument Data Acquisition and Controls (IDAC) for SNS and HFIR at Oak Ridge National Laboratory. I am transitioning to a full time role as Group Leader for the Integrated Control Systems for the Second Target Station (STS) Project at ORNL now. So we are searching for my replacement in the IDAC role.

The Instrument Data Acquisition and Controls Group consists of 20+ engineers and technicians responsible for:
  • designing, building and maintaining custom and commercial electronics for acquiring neutron scattering data
  • developing and supporting software for acquiring, processing and managing data
  • developing and supporting software and user interfaces for beam line control, data collection and experiment automation
  • and building and maintaining the computing, data storage and network infrastructure for data acquisition, data analysis and remote access.

We support 30 neutron scattering and neutron imaging instruments at SNS (accelerator-based pulsed neutron source) and HFIR (reactor-based steady-state neutron source), with a few additional instruments under construction or in planning. The software for data acquisition and controls is built primarily using the EPICS toolkit. 


Feel free to contact me for more information.

I will also be hiring for a variety of positions in my STS role so please reach out if you would like to learn more. We anticipate increasing staffing significantly over the next year or two as the project ramps up.

Regards,
-- 
Steven Hartman
hartmansm at ornl.gov




Navigate by Date:
Prev: Newport DL325 Igor Kriznar via Tech-talk
Next: EPICS7 roller-coaster Rolf Keitel via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
Navigate by Thread:
Prev: ThorLabs BBD201 Igor Kriznar via Tech-talk
Next: EPICS7 roller-coaster Rolf Keitel via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
ANJ, 09 Apr 2020 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·