EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: travis-ci.org service changes
From: Michael Davidsaver via Tech-talk <tech-talk at aps.anl.gov>
To: EPICS Tech-Talk <tech-talk at aps.anl.gov>
Date: Fri, 6 Nov 2020 15:12:20 -0800
Anyone using travis-ci.org has probably noticed that there has
been a ~perpetual backlog in the build queue since 22 Oct.

It seems that this is being tied to the one again off again
forced migration of open source projects from travis-ci.org
to travis-ci.com

Apparently travis-ci.org goes away on 31 December 2020.

https://docs.travis-ci.com/user/migrate/open-source-repository-migration#q-what-will-happen-to-travis-ciorg-after-december-31st-2020

Anyone thinking about migrating now may want to read the
announcement from this Monday on changes to the pricing model
for travis-ci.com which more or less does away with the free tier.

https://blog.travis-ci.com/2020-11-02-travis-ci-new-billing

Highlights:

> For those of you who have been building on public repositories
> (on travis-ci.com, with no paid subscription), we will upgrade
> you to our trial (free) plan with a 10K credit allotment (which
> allows around 1000 minutes in a Linux environment).

Trial accounts credits are non-recurring.

fyi. A build of the epics-base 7.0 branch can take ~190 minutes of
builder time.  So 1000 minutes covers ~5 builds.


Replies:
Re: travis-ci.org service changes Ralph Lange via Tech-talk

Navigate by Date:
Prev: Re: GPIB remote control Maren Purves via Tech-talk
Next: Re: travis-ci.org service changes Ralph Lange via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
Navigate by Thread:
Prev: Re: GPIB remote control Maren Purves via Tech-talk
Next: Re: travis-ci.org service changes Ralph Lange via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
ANJ, 08 Nov 2020 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·