1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  2025  <2026 Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  2025  <2026
<== Date ==> <== Thread ==>

Subject: 2026 white paper on EPICS vs commercial SCADA software
From: "Evans, Richard K. \(GRC-H000\) via Tech-talk" <tech-talk at aps.anl.gov>
To: "tech-talk at aps.anl.gov" <tech-talk at aps.anl.gov>
Date: Wed, 24 Jun 2026 17:29:05 +0000
Dear EPICS community, 

I recently came across a new whitepaper that present a comparative evaluation of EPICS against various commercial SCADA platform alternatives. The evaluation uses a set of requirements that they state are representative of the IFMIF-DONES plant currently being constructed in Escúzar, Granada, Spain.  The paper is linked below.  If you have a moment and are inclined, please take a look at Table 2 and Figure 3 and let me know if you feel that EPICS has been rated accurately/fairly.

"A comparative study of industrial and open-source SCADAs to optimize the design of control systems for the IFMIF-DONES plant"
https://urldefense.us/v3/__https://www.researchgate.net/publication/403928088_A_comparative_study_of_industrial_and_open-source_SCADAs_to_optimize_the_design_of_control_systems_for_the_IFMIF-DONES_plant__;!!G_uCfscf7eWS!dLrszc_F4-MNU6rvR6_tBzD-oxGJWgrejzopanOX1p9BNsJxyEPjxFevbkdTX0hdTvbTDWos84abzN6ViuHnARMNORgosr0r$ 

Note - Figure 3 shows EPICS as seriously deficient as compared to commercial SCADA software, but then I saw what they said on Table 2 requirement #17 wrt video and it doesn't seem like they fully understood EPICS well enough to give it an honest rating.  

The paper is being circulated within my organization as strong evidence that EPICS is a poor option as a control system SCADA for a facility.  Any insights this community can provide in explaining the possible motivations of  the authors and/or highlighting any clear bias or incorrect assessments that the paper may contain would be much appreciated.

Thanks in advance.
- Rich Evans
  NASA Armstrong Test Facility 
  Sandusky, Ohio

Replies:
Re: 2026 white paper on EPICS vs commercial SCADA software Diego Omitto via Tech-talk

Navigate by Date:
Prev: Re: Problems with Dante (XGLab) Driver Mark Rivers via Tech-talk
Next: Re: 2026 white paper on EPICS vs commercial SCADA software Diego Omitto via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  2025  <2026
Navigate by Thread:
Prev: RxEpics/cpp: ReactiveX-style recipes for EPICS/PVXS Khokhriakov, Igor via Tech-talk
Next: Re: 2026 white paper on EPICS vs commercial SCADA software Diego Omitto via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  2025  <2026
ANJ, 24 Jun 2026 · Home · News · About · Talk · Base · Modules · Extensions ·
· Distributions · Download · Documents · Links · Licensing ·