Experimental Physics and
| |||||||||||||||
|
On April 10, the ISAC-II facility accelerated a 40C (10+) beam through the new superconducting linac (20 superconducting RF cavities) to 220 MeV (5.5 MeV/u). This achieved the last mile-stone of a five-year development program, which was carried out in parallel to the routine running of the ISAC-I radioactive beam facility. This is another success for EPICS. Our sincere thanks go to everybody in the EPICS community who helped with ideas, support, tools, etc. to keep our fun-level high. - rolf - -- +-------------------------------------------------+ | Rolf Keitel, TRIUMF Tel: (604) 222-7453 | | Group Leader ISAC Controls Fax: (604) 222-7307 | | and Electronics Development | | Vancouver, B.C., Canada | +-------------------------------------------------+
| ||||||||||||||
ANJ, 02 Sep 2010 |
·
Home
·
News
·
About
·
Base
·
Modules
·
Extensions
·
Distributions
·
Download
·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing · |