EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Job opportunities at PSI
From: "Zimoch Dirk \(PSI\) via Tech-talk" <[email protected]>
To: "[email protected]" <[email protected]>
Date: Mon, 8 Jul 2019 16:03:47 +0000
PSI has currently two open positions in Controls related to the upcomming SLS
upgrade.

Timing and other low level software support:
https://www.psi.ch/en/pa/job-opportunities/29309-embedded-software-ingenieur

Build and deploy support on Windows (for German speakers):

https://www.psi.ch/de/pa/stellenangebote/29027-software-ingenieurin-software-ingenieur-devops

Both are fix term contracts for 3 years. 

Dirk


Navigate by Date:
Prev: Re: Fwd: cross-compiling (kind of) with Buildroot Pierrick M Hanlet via Tech-talk
Next: Re: Fwd: cross-compiling (kind of) with Buildroot Johnson, Andrew N. via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Epics developers meeting Oct' 2019. Shroff, Kunal via Tech-talk
Next: updating ADAndor from RHEL6 to RHEL7 Pearson, Matthew R. via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024 
ANJ, 08 Jul 2019 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·