EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: Help required
From: "Paduan Donadio, Marcio via Tech-talk" <[email protected]>
To: EPICS tech-talk <[email protected]>
Date: Thu, 1 Aug 2019 16:32:25 +0000
Hello, Cool Chips.

When an input field has a PV with PP (Process Passive), it forces the record to process before giving the result to the destination.

In your example, each 1 second "sum" will process. When this happens, it will ask for "A" and "B" to process and give them the data after it.

If you used NPP (Non Process Passive), "sum" would take whatever value is available in A and B, without having them process first.

For a Soft Channels AI, as in your example, this really is not a big deal. But imagine if A and B are attached to a physical device. They will read information from the device only when processing. With NPP, "sum" would have always read the same value over and over, even if the device is changing status.

I hope that helps.

Best regards,

Márcio Paduan Donadio
Control Systems Engineer - SLAC

On 7/31/19, 8:18 AM, "[email protected] on behalf of Andrew Johnson via Tech-talk" <[email protected] on behalf of [email protected]> wrote:

    Cool Chips


References:
Fwd: Help required Andrew Johnson via Tech-talk

Navigate by Date:
Prev: Re: Alarm system setup Shroff, Kunal via Tech-talk
Next: EPICS 7.0.3 Released Johnson, Andrew N. via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Fwd: Help required Andrew Johnson via Tech-talk
Next: Call for EPICS October 2019 collaboration meeting Farnsworth, Richard via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  <20192020  2021  2022  2023  2024 
ANJ, 01 Aug 2019 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·