1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: RE: PTP hardware timestamps in EPICS facilities
From: "Frank, William \(STFC, RAL, ISIS\) via Tech-talk" <tech-talk at aps.anl.gov>
To: Pilar Gil <pilar.gil at sevensols.com>
Cc: "tech-talk at aps.anl.gov" <tech-talk at aps.anl.gov>
Date: Thu, 3 Sep 2020 10:05:14 +0000

Hi Pilar,

 

Thanks for clarification and additional information about the WR integration work Seven Solutions have done. I'm sure I’ll be in touch with more questions!

 

Cheers,

Will

 

From: Pilar Gil <pilar.gil at sevensols.com>
Sent: 01 September 2020 16:55
To: Frank, William (STFC,RAL,ISIS) <william.frank at stfc.ac.uk>; tech-talk at aps.anl.gov
Subject: Re: PTP hardware timestamps in EPICS facilities

 

Hello William,

 

I´m part of the team of Seven Solutions involved in the integration of White Rabbit Solutions for particle accelerators.

As you have mentioned in your email, some of our WR solutions are currently in operation in LIPAc as part of the IFMIF/EVEDA project with outstanding performance.

 

The contributions of Seven Solution to the mentioned accelerator have been:

- The Radio Frequency and Time distribution based on White Rabbit products: they offer the distribution of global time references to all the nodes in the network in a deterministic and dependable way),

- RF Control System (LLRF) and Beam Instrumentation (BPM): both solutions include EPICS support and the use of WR for the Master Oscillator distribution and timing synchronization (postmortem, fast interlocks or control)

 

You can find further information related to the WR project here: https://white-rabbit.web.cern.ch/ or some example of results in system tested in the LIPAc installation here: http://ibic2019.vrws.de/papers/wepp013.pdf or in our website: https://sevensols.com

 

Feel free to contact me if you have any further questions.

Kind regards,

Pilar

 

 


 This e-mail and any materials attached hereto, including, without limitation, all content hereof and thereof are confidential and proprietary to Seven Solutions,S.L and/or its affiliates, and are *confidential*. Without the prior written consent of Seven Solutions, this content may not (i) be disclosed to any third party, (ii) be reproduced, modified or otherwise used by anyone other than current employees of Seven Solutions or its affiliates. If you are not the intended recipient or if this message has been received in error, please notify us immediately via e-mail and delete it.

This email and any attachments are intended solely for the use of the named recipients. If you are not the intended recipient you must not use, disclose, copy or distribute this email or any of its attachments and should notify the sender immediately and delete this email from your system. UK Research and Innovation (UKRI) has taken every reasonable precaution to minimise risk of this email or any attachments containing viruses or malware but the recipient should carry out its own virus and malware checks before opening the attachments. UKRI does not accept any liability for any losses or damages which the recipient may sustain due to presence of any viruses. Opinions, conclusions or other information in this message and attachments that are not related directly to UKRI business are solely those of the author and do not represent the views of UKRI.


References:
Re: PTP hardware timestamps in EPICS facilities Pilar Gil via Tech-talk

Navigate by Date:
Prev: RE: PTP hardware timestamps in EPICS facilities Frank, William (STFC, RAL, ISIS) via Tech-talk
Next: Re: PTP hardware timestamps in EPICS facilities Hamadyk, Paul (DLSLtd, RAL, LSCI) via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
Navigate by Thread:
Prev: Re: PTP hardware timestamps in EPICS facilities Pilar Gil via Tech-talk
Next: AreaDetector: PVs from driver created parameters not updating David Vine via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
ANJ, 03 Sep 2020 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·