1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
<== Date ==> <== Thread ==>

Subject: PV Seq not process everytime
From: GAGET Alexis via Tech-talk <tech-talk at aps.anl.gov>
To: "tech-talk at aps.anl.gov" <tech-talk at aps.anl.gov>
Date: Wed, 9 Feb 2022 08:02:18 +0000

Dear EPICS expert,

for motor control with a sequence software I have the following PVs:


record(ao, "myPV1"){

}


record(seq,"mySequence"){

     field(DLY1,"0")

     field(DOL1,"myPV1 CP")

     field(LNK1,"mySetPoint PP")

     field(DLY2,"0.5")

     field(DOL2,"1")

     field(LNK2,"myCommand PP")

}


myPV1 is the destination i want to reach, each time I change it, it process this sequence to set the destination in mySetPoint, and 0.5s later to activate the command. It works well most of the time. But yesterday sometimes, myPV1 was changed but mySequence was not processed .... it causes the whole sequence (emittance measurement) to get stuck. It can be unstuck by processing "mySequence" but it's a long sequence and we don't stay in front of the computer.


This morning we have rebooted the IOC, and the same problem occured but since maybe 1 hour it work very well.


Anyone have an idea why is it occuring ?


EPICS version is 3.15.4


Thanks a lot for your consideration


Alexis Gaget

CEA Saclay


Replies:
Re: PV Seq not process everytime Ralph Lange via Tech-talk

Navigate by Date:
Prev: RE: Questions from the Static Database Access chapter of the Application Developer's Guide Wang, Andrew via Tech-talk
Next: Re: PV Seq not process everytime Ralph Lange via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
Navigate by Thread:
Prev: Software management plan for EPICS bob dalesio via Tech-talk
Next: Re: PV Seq not process everytime Ralph Lange via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
ANJ, 14 Sep 2022 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·