EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: R3.14.8 Release timetable
From: Andrew Johnson <[email protected]>
To: EPICS core-talk <[email protected]>
Date: Wed, 07 Sep 2005 10:56:20 -0500
Dalesio, Leo `Bob` wrote:
Can we meet next week by video conference to discuss the CA Client interface?
Does everyone have access to video conferencing equipment?

We do at APS (internet connection preferred but I believe we have an ISDN link as well), but the room(s) that have it are fairly busy so we'd need to set a time in advance when one of them was free.

Is multi-site conferencing commonly supported by these things? I've used video conferencing before, but never with more than two sites at once.

- Andrew
--
English probably arose from Normans trying to pick up Saxon girls.

Replies:
Re: Video Conferencing Ralph Lange
References:
RE: R3.14.8 Release timetable Dalesio, Leo `Bob`

Navigate by Date:
Prev: Re: R3.14.8 Release timetable Marty Kraimer
Next: Re: R3.14.8 Release timetable Ralph Lange
Index: 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: RE: R3.14.8 Release timetable Dalesio, Leo `Bob`
Next: Re: Video Conferencing Ralph Lange
Index: 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 02 Feb 2012 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·