EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024  Index 2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: P4P release prep
From: Michael Davidsaver <[email protected]>
To: PVData Developers <[email protected]>, EPICS core-talk <[email protected]>
Date: Thu, 1 Feb 2018 09:31:59 -0800
All,

I'm preparing for an initial release of my P4P module (PVAccess for Python).
So I'd like to ask for test results from anyone who has time+interest in doing
them.  My hope is to do the release next week.

The most basic testing is to build and run the unit tests.  This is described in:

https://mdavidsaver.github.io/p4p/building.html

pip/virtualenv users should note the included requirements-*.txt files
and the "Multiple Python Versions" section.

If you have a PVAccess server, also exercise the get/put/monitor operations
with the include command line tools.

> python -m p4p.client.cli -h

Or programatically from eg. an ipython shell.

> from p4p.client.thread import Context
> ctxt = Context('pva')
> print ctxt.get('pv:name')

further example, and reference at https://mdavidsaver.github.io/p4p/client.html

Those using the RPC operation will want to look at the helper API

https://mdavidsaver.github.io/p4p/rpc.html#client-example


Interested users might want to have a look at the new version of MASAR
save/restore which uses P4P.  A release of this will hopefully be following
soon after this P4P release.  https://github.com/mdavidsaver/masarService


the main documentation page

https://mdavidsaver.github.io/p4p/

Replies:
Re: P4P release prep Williams Jr., Ernest L.

Navigate by Date:
Prev: Re: Problems with parallel make in base 7.0.1.1 on Visual Studio 2015 and Visual Studio 2017 when HOST_OP=NO Andrew Johnson
Next: Build failed in Jenkins: epics-base-3.14-test #26 APS Jenkins
Index: 2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: EPICS 7 and CS-Studio core developers meeting registration. kunal shroff
Next: Re: P4P release prep Williams Jr., Ernest L.
Index: 2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024 
ANJ, 05 Feb 2018 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·