EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Engineering and Instrumentation Section lead job at SLAC
From: "Chestnut, Ronald P." <[email protected]>
To: <[email protected]>
Date: Tue, 8 Jul 2008 17:44:16 -0700
We are looking for a hardware engineer/manager to lead a section at SLAC, since our section lead, who has been at SLAC for the past 43 years, is retiring. The group does digital and analog board design, as well as beam instrumentation. The next challenges include the installation and commissioning of the LCLS, a complete retooling of the LINAC, and setting the future direction for SLAC.

Please see the position description at:

http://www-public.slac.stanford.edu/hr/jobs/jobdetail.asp?REQID=34710

Ron Chestnut
Deputy Head of Controls/SLAC
Off.: 650 926 2450
Cell: 650 520 6186


Navigate by Date:
Prev: Re: Ethernet-to-RS232 Ned Arnold
Next: RE: EPICS meeting in Padua Mark Rivers
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: Ethernet-to-RS232 Dirk Zimoch
Next: Introducing CAML Tom Pelaia
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 02 Sep 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·