There is no plan to make a time stamp relative to the update of a single field. What is the demand for this? What is the situation where this is required?
-----Original Message-----
From: [email protected] on behalf of Benjamin Franksen
Sent: Thu 1/29/2009 8:46 AM
To: [email protected]
Subject: wrong timestamps in monitors
Hi,
I think this is a known issue, it is at least as old as 3.13.9. EPICS posts
CA events when a non-VAL fields get written to, and it does so
independently of record support. There are two cases:
- If the field does not have the PP property, then the record is not
processed as a result of the put, and the CA event is posted with the old
timestamp.
- If the field /does/ have the PP property, then the record gets processed
as a result of the put, which woudl update the record's timestamp, but
processing comes /after/ EPICS base posts the event, thus the event has the
wrong (old) timestamp.
It should be clear that this means one should /not/ trust the history of
value changes as e.g. reported by the channel archiver (or simply the
output of camonitor) whenever the PV in question references a non-VAL
field. At least not w.r.t. the reported timestamps.
Is this going to be addressed any time soon?
Cheers
Ben
--
"Programming = Mathematics + Murphy's Law" (E.W.Dijkstra)
Any text below this line has automatically been added by the
mail server and does not necessarily represent my personal opinion.
Helmholtz-Zentrum Berlin für Materialien und Energie GmbH
Glienicker Straße 100, 14109 Berlin
Vorsitzende des Aufsichtsrates: Dr. Beatrix Vierkorn-Rudolph
Stellvertretende Vorsitzende: Dr. Jutta Koch-Unterseher
Geschäftsführer: Prof. Dr. Anke Rita Pyzalla, Prof. Dr. Dr. h.c. Wolfgang Eberhardt, Dr. Ulrich Breuer
Sitz der Gesellschaft: Berlin Handelsregister: AG Charlottenburg, 89 HRB 5583
Information:
Durch die Fusion mit dem ehemaligen Hahn-Meitner-Institut (HMI) ist
BESSY nun Teil des neuen Helmholtz-Zentrum Berlin für Materialien
und Energie (HZB). Die Fusion wird im Januar 2009 vollzogen sein.
By the merger with the former Hahn-Meitner-Institut (HMI), BESSY
became part of the new Helmholtz-Zentrum Berlin für Materialien und
Energie (HZB). The merger will be completed by January 2009.
Disclaimer automatically attached by the E-Mail Security Appliance
mail0.bessy.de 01/29/09 at Helmholtz-Zentrum Berlin GmbH.
- Replies:
- RE: wrong timestamps in monitors Dalesio, Leo
- References:
- wrong timestamps in monitors Benjamin Franksen
- Navigate by Date:
- Prev:
EPICS collaboration meeting Dalesio, Leo
- Next:
RE: wrong timestamps in monitors Dalesio, Leo
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
<2009>
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
wrong timestamps in monitors Benjamin Franksen
- Next:
RE: wrong timestamps in monitors Dalesio, Leo
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
<2009>
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
|