EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: seqShow Get/Put in progress
From: Benjamin Franksen <[email protected]>
To: Matt Rippa <[email protected]>, Talk EPICS Tech <[email protected]>
Date: Tue, 13 Feb 2018 18:06:37 +0100
On 02/12/2018 04:20 PM, Matt Rippa wrote:
> I'm trying to learn more about the information given when I run seqShow
> <thread_id>. Specifically, the Get/Put in progress section.
> What do the variable number of zeros represent? In my output below
> I see 2, whereas the link in manual shows 6.
> 
> http://www-csr.bessy.de/control/SoftDist/sequencer/Using.html?highlight=get%20progress#shell-command-reference
> 
> Other times I've seen this entry fill up nearly 2 rows of zeros.  Is it
> documented more and I just missed it?

This is not documented well. Thanks for the reminder, will fix.

> *Get in progress = [00]  Put in progress = [00] *

This is an attempt at presenting low-level information about each
channel in a compact way. Each state set needs to remember pending
asynchronous (callback-based) put and get operations for each PV; at
each time, for each state set and channel there can be only one get and
one put pending. The digits inside the []-brackets tell you for which
channel this state set has pending gets or puts (1=yes, 0=no). The
digits are output in the order in which the channels are declared in the
program (which is the same order in which seqChanShow shows them). The
more channels you have, the longer the array of digits gets, which is
why the length differs; for large programs with many channel variables
the array may span more than a single line.

In your example you have two channels and for none of them there is a
put or get pending  (which is the normal case).

Cheers
Ben
-- 
"Make it so they have to reboot after every typo." ― Scott Adams

Attachment: signature.asc
Description: OpenPGP digital signature


Replies:
Re: seqShow Get/Put in progress Matt Rippa
References:
seqShow Get/Put in progress Matt Rippa

Navigate by Date:
Prev: RE: SMA100A Signal Generatordriver Caracappa, Anthony
Next: Re: seqShow Get/Put in progress Matt Rippa
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: seqShow Get/Put in progress Matt Rippa
Next: Re: seqShow Get/Put in progress Matt Rippa
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  <20182019  2020  2021  2022  2023  2024 
ANJ, 13 Feb 2018 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·