We are starting to build the Integrated Control Systems Group for the Second Target Station Project at ORNL. The STS is a >$1B DOE project to be constructed at the ORNL Spallation Neutron Source. We are currently preparing for a CD-1 review. The ICS scope includes controls systems, data acquisition, computing infrastructure, and protection systems for the neutron scattering instruments, accelerator, target, and conventional facilities technical utilities, using the EPICS toolkit.
This is a great opportunity to join the project at an early stage and help define technical approaches and system architecture.
Apply online at:
https://jobs.ornl.gov/job/Oak-Ridge-Second-Target-Station-Control-Systems-Engineer-TN-37854/625694400/
or contact me for more information.
--
Steven Hartman
hartmansm at ornl.gov
STS Integrated Control Systems Group Leader
- Navigate by Date:
- Prev:
Re: XSPRESS3 hdf5 problems John Dobbins via Tech-talk
- Next:
Open Instrumentation & Controls Deputy Group Leader Position at LANL Pieck, Martin via Tech-talk
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
<2020>
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
AW: pco Camera USB and IEEE interface Sintschuk, Michael via Tech-talk
- Next:
Open Instrumentation & Controls Deputy Group Leader Position at LANL Pieck, Martin via Tech-talk
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
<2020>
2021
2022
2023
2024
|