EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
<== Date ==> <== Thread ==>

Subject: Job opportunity at PSI: Group Leader Control Systems
From: "Schilcher Thomas \(PSI\) via Tech-talk" <tech-talk at aps.anl.gov>
To: "tech-talk at aps.anl.gov" <tech-talk at aps.anl.gov>
Date: Tue, 22 Feb 2022 09:38:49 +0000

Dear all,

 

We are looking for a group leader of the group “Integration and Support – Large Research Facilities” within the section Control Systems at PSI. The group of 8 engineers and physicists is responsible for the integration and maintenance of all accelerator subsystems into the control system at all accelerator facilities at PSI (High Intensity Proton Accelerator HIPA, Proton Therapy FacilityPROSCAN, Swiss Light Source and SwissFEL).

 

Further information is available at

https://www.psi.ch/en/pa/job-opportunities/50246-group-leader-control-systems

 

In case of any further questions don't hesitate to contact me by email.

 

Best regards,

Thomas Schilcher

 

__________________________________________
Paul Scherrer Institut 
Dr. Thomas Schilcher

Head of Department Electronics and Control Systems
WBGA/C24
Forschungsstrasse 111
5232 Villigen PSI
Switzerland

Tel
.: +41 56 310 45 93
E
mail: thomas.schilcher at psi.ch 

 


Navigate by Date:
Prev: mrfioc2 error gjzhai--- via Tech-talk
Next: Re: Frequent disconnect and auto-reconnects with Serial ASYN and Stream controlled device Ashish Sharma via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
Navigate by Thread:
Prev: mrfioc2 error gjzhai--- via Tech-talk
Next: Job opening at PSI (Group leader Control systems integration) Celcer Tine (PSI) via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  <20222023  2024 
ANJ, 14 Sep 2022 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·