Hi,
We did a backup/restore service to our beam transport at LNL,
it's based on Owncloud and python scripts.
Thanks,
-Mauro
On 3/12/2016 11:49 AM, [email protected] wrote:
Hi,
my EPICS IOC has a set of PV of this format:
<MODULE_ID>:<CHANNEL_ID>:attr1
<MODULE_ID>:<CHANNEL_ID>:attr2
...
<MODULE_ID>:<CHANNEL_ID>:attr<n>
where <MODULE_ID> and <CHANNEL_ID> is inside 0...15 interval;
I'm looking for a "strategy" to give the operator
the feature of copy the setup of a module <x> to a module
<y> or copy a setup of a channel <x><c> to a channel <y><c>;
Thanks in advance,
Gennaro
--
________________________________________________________________________
Mauro Giacchini
Control Systems Specialist
INFN Laboratori Nazionali di Legnaro
Viale Università 2
I 35020 Legnaro (Padova)
Tel. +39 049 8068 558
Fax 558
EPICS _at_ LNL http://www.lnl.infn.it/~epics/
...the first EPICS installation to the project SPES realized from the
scratch in ITALY is in production since begin 2010!!
________________________________________________________________________
---
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus
- Replies:
- Re: parametric PV save/restore Ebner Simon Gregor (PSI)
- References:
- parametric PV save/restore [email protected]
- Navigate by Date:
- Prev:
RE: mrfioc2 error at uTCA platform 김지화(빔라인장치팀)
- Next:
Re: parametric PV save/restore Ebner Simon Gregor (PSI)
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
<2016>
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
RE: parametric PV save/restore Mooney, Tim M.
- Next:
Re: parametric PV save/restore Ebner Simon Gregor (PSI)
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
<2016>
2017
2018
2019
2020
2021
2022
2023
2024
|