Experimental Physics and Industrial Control System
|
On March 31, 2017 4:47:43 PM GMT+02:00, Miguel < [email protected]> wrote:
Hi all,
I have a PV that is an integral over the day. I
would like at the end of the day(certain timestamp) to store it to
the DB (maybe in another PV) and after that reset the integral.
I would also like that if epics restarts the
intergal will initiate with the most recent value in the DB.
My DB is with mysql with the CSS archive engine.
my current integral PV:
record(calc, "$(user):DLI"){
field(DESC, " Daily light Integral
(mol.m-2.day-1)")
field(INPA, "$(user):Lum1")
field(INPB, "$(user):DLI")
field(CALC, "A*1e-6+B")
field(SCAN, "1 second")
field(EGU, "DLI")
#field(PREC, "6")
#field(ADEL, "10")
field(LOPR, "0")
field(HOPR, "1000") #High Operating Range
}
Thanks a lot,
MiguelB
Yet another idea:
The stringin record has support for strftime formats. If you use that to create a six digit hhmmss number, you can use a calcout record to e.g. check for <10 and process a seq record on the 1->0 edge to do the integral reset sequence.
Cheers,
~Ralph |
- Replies:
- Re: Reset integral pv and store it Kasemir, Kay
- Re: Reset integral pv and store it Maren Purves
- References:
- Reset integral pv and store it Miguel
- Navigate by Date:
- Prev:
Re: Reset integral pv and store it Kasemir, Kay
- Next:
Re: Reset integral pv and store it Kasemir, Kay
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
<2017>
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
Re: Reset integral pv and store it Kasemir, Kay
- Next:
Re: Reset integral pv and store it Kasemir, Kay
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
<2017>
2018
2019
2020
2021
2022
2023
2024
|
ANJ, 21 Dec 2017 |
·
Home
·
News
·
About
·
Base
·
Modules
·
Extensions
·
Distributions
·
Download
·
·
Search
·
EPICS V4
·
IRMIS
·
Talk
·
Bugs
·
Documents
·
Links
·
Licensing
·
|