EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: More changes.. when does Beta end
From: [email protected] (Marty Kraimer)
To: [email protected]
Date: Tue, 20 Jun 1995 12:48:06 -0500
> From [email protected] Tue Jun 20 10:19 CDT 1995
> Date: Tue, 20 Jun 95 08:18:58 PDT
> From: [email protected] (Alan K Biocca)
> To: [email protected], [email protected]
> Subject: Re: More changes.. when does Beta end
> Content-Type> : > text> 
> Content-Length: 632
> 
> Can we move out of Beta with a known bug that wasn't in previous releases?
> 
> Perhaps we should FREEZE all improvements and get the last few bugs out.
> 
> Alan K Biocca
> 
> -- included message follows --
> 
> Date: Tue, 6 Jun 1995 08:34:53 -0500
> From: [email protected] (Marty Kraimer)
> Message-Id: <9506061334.AA02519@phoebus>
> To: [email protected]
> Subject: Re: AO record DOL field fails with a CA link
> Content-Length: 1542
> 
> 
> This has not yet been fixed. The change actually has to be made to
> the database to channel access code. I have not had time to fix the problem,
> and the person who wrote the code is no longer here.
> 
> Marty Kraimer
> 

To the best of my knowledge this bug was in all previous releases.
In addition there is a simple "work-around". It is as follows

set up a soft ai record that has INP reference the record in the other ioc.
Let the DOL field reference the soft ai record. The soft ai record can
be passive. The dol field can specify PP and MS. This should work.

Thus I do not think that this bug is sufficient to stop beta13 from becomming
the official 3.12. If we allow this fix we will be opening the floodgates
with regards to changes.

Marty Kraimer


Navigate by Date:
Prev: Re: e2sr name mangling Matthew Needes (LANL)
Next: Building for more than one host architecture Janet B. Anderson
Index: 1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: More changes.. when does Beta end watson
Next: Re: More changes.. when does Beta end Alan K Biocca
Index: 1994  <19951996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 10 Aug 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·