EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  <20042005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  <20042005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Vacancy at APS
From: John Maclean <[email protected]>
To: tech-talk <[email protected]>
Date: Fri, 23 Apr 2004 16:16:41 -0500
We have an opening for an EPICS application developer at the APS.

http://external.hr.anl.gov/job/detail.jsp?userreqid=307010+AOD

John.


Navigate by Date:
Prev: Re: Initialising an ao record from a constant DOL Benjamin Franksen
Next: Re: Initialising an ao record from a constant DOL Andrew Johnson
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  <20042005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: EPICS collaboration meeting presentations (recall) Kate Feng
Next: gateway2_0_0_0Beta8 compile error. Kiman Ha
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  <20042005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 10 Aug 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·