EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  <20152016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  <20152016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: sabbatical at NSLS II
From: "Dalesio, Leo" <[email protected]>
To: "[email protected]" <[email protected]>
Date: Sun, 1 Mar 2015 15:00:43 +0000
Hi All,
I have a need for support for commissioning of experimental beam lines. We are using Delta Tau motor controllers, areaDetector, and Control System Studio. We are also deploying a python based environment for experiment control and data acquisition that is a distributed architecture. It is integrated into a data analysis pipeline/provenance tracking python based project.
This may be an opportunity for me to get some help commissioning the beam lines and also some outside perspective on the developments we are pursuing. The positions could be from 6 months to 18 months. If you have someone experienced in these technologies a shorter time could be considered. If training is required in the delta tau/motion control and area detector subjects, I would prefer longer commitments so that we can get some benefit from the learning curve.
Please consider the potential cross-training benefit to your facility.
Thanks,
Bob
<http://www.grammarly.com/?utm_source=dict&utm_medium=link&utm_campaign=chrome_plg>

Navigate by Date:
Prev: RE: Qt Designer with Epics Records Andrew Rhyder
Next: Reading data from bo record? Ryan Pierce
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  <20152016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: LinuxRT remote reboot from EPICS Luchini, Kristi L.
Next: Reading data from bo record? Ryan Pierce
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  <20152016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 16 Dec 2015 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·