Hi Nilson,
I don't have experience with the PointGrey GigE cameras, but with Basler
cameras. These cameras have parameters to tune the network settings.
What happens if a trigger is received by a camera:
The sensor is exposed according to the settings. After this time has elapsed,
the sensor is read out and the data streamed to the network in packages of a
defined size. Normally 1500 Bytes (MTU) as fast as possible. As this is done
using UDP, there is no collision detection or re-sending of lost packets.
BUT:
You can tune a delay, that the camera will wait after the exposure is finished
until it sends its first packet
AND
you can tune a parameter defining the time between two packets send by a
camera.
If you configure these parameters correctly, no data collisions of any amount
of cameras (up to 24 as stated by Basler) will occur. There PYLON software can
configure this settings aromatically. Check for the PointGrey software if it
can do the same.
Hope this information will help you.
Regards,
Jörn
Am Donnerstag, 7. Februar 2019, 10:17:19 CET schrieb Nilson Pereira via Tech-
talk:
> Hello community,
>
> I have 3 cameras (Point Grey GigE Blackfly) that I want to use
> simultaneously at a very low framerate (1fps) for BPM purposes.
>
> Each camera has its own IOC and they run perfectly one at a time.
> However, when running simultaneously, always 2 cameras conflict with
> each other and not necessary the same two cameras. During conflict, the
> IOC shows an error about frame inconsistency on both affected cameras. I
> have a gigabit network port on both switch and server, and the port is
> far from saturation.
>
> Does anyone have experience with GigE cameras and have seem this type of
> problem? Is this a protocol issue since it happens even with the
> original (Flycap2) software ?
>
> I appreciate any shared experience with problems with GigE cameras that
> could give a hint on why this is happening.
>
> Best,
>
> Nilson
>
>
> ________________________________
>
> Helmholtz-Zentrum Berlin für Materialien und Energie GmbH
>
> Mitglied der Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren
> e.V.
>
> Aufsichtsrat: Vorsitzender Dr. Karl Eugen Huthmacher, stv. Vorsitzende Dr.
> Jutta Koch-Unterseher Geschäftsführung: Prof. Dr. Bernd Rech
> (kommissarisch), Thomas Frederking
>
> Sitz Berlin, AG Charlottenburg, 89 HRB 5583
>
> Postadresse:
> Hahn-Meitner-Platz 1
> D-14109 Berlin
- Replies:
- Re: Point Grey GigE Blackfly conflict Mark Rivers via Tech-talk
- References:
- Point Grey GigE Blackfly conflict Nilson Pereira via Tech-talk
- Navigate by Date:
- Prev:
Re: Point Grey GigE Blackfly conflict Wayne Lewis via Tech-talk
- Next:
How to read and Write PVs in C# shakeel ahmad via Tech-talk
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
<2019>
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
Re: Point Grey GigE Blackfly conflict Wayne Lewis via Tech-talk
- Next:
Re: Point Grey GigE Blackfly conflict Mark Rivers via Tech-talk
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
<2019>
2020
2021
2022
2023
2024
|