EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Job Openings at Fermilab
From: James F Patrick via Tech-talk <tech-talk at aps.anl.gov>
To: "tech-talk at aps.anl.gov" <tech-talk at aps.anl.gov>
Date: Wed, 23 Sep 2020 17:04:00 +0000

Fermilab is beginning construction of a new 800 MeV superconducting linac, known as PIP-II, to replace the current 50 year old linac injector to the accelerator complex. The control system for PIP-II will be based on EPICS. Furthermore a major parallel modernization project is underway to replace the existing custom control system for the accelerator complex to a system based on EPICS, which will encompass the PIP-II control system. Both projects are currently in the early planning stages. The modernization project, known as ACORN, recently received CD-0 approval from the DOE with substantial tentative funding.

 

Currently we have the following openings on the ACORN project in the Accelerator Controls department. Applications should be submitted online through the links below.


Computing Services Architect I:

 https://jobs-us.technomedia.com/fermilab/?_4x1F8B080000000000000075CE4B0E83201485E1DD383470019501039F8D0B604C7C60835530A849DD7D9346074DECFCE43B7FD74C93F6FB6E7AC130700A0A20610453AE88C40A618850B0BEF4F1D0B638ECCF0871A6B064E7E88F412F64F1AED3EB5A6F7A168BF35B3385A36B17B76EC63EC311030ABC6B7ABBCFADF637109C8EB16693B22EEEBEAEDE7727DC30686FFA6FBBA83292165154E550704E498CD3ACA4B4A2490C659A93E803E81E3FE106010000&offerid=1144

 

Applications Development and Systems Analyst III:

https://jobs-us.technomedia.com/fermilab/?_4x1F8B0800000000000000758E4D0E832018446FE3D2F0A1585DB010288D07706DFCC106AB6000937AFB366DDDD9E564266F5EDFCEB372DBA6074A0017296E30CE49820AD2400D0D029CA1C83FD47E5346ECE664447EA33F8C77FAF6ABB3BDF2BE0A6AA1AB75A19DE3C976ABF5419B7B3C014691B3ED60B6A553EE047470B4D1A1AE2B71F675F83E7B6AC751393D7CDC29E249895292132EE5054A60528802186739C3E535932F6966F0B506010000&offerid=1146


Erik Gottschalk
erik at fnal.gov
ACORN Project Head

Jim Patrick
patrick at fnal.gov
Controls Department Head

Navigate by Date:
Prev: AW: autosave 5-10-1 on RTEMS-4.10.2, mount failed Sintschuk, Michael via Tech-talk
Next: EPICS QT question Jörn Dreyer via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
Navigate by Thread:
Prev: Does edm static widget support chinese input? Silver via Tech-talk
Next: EPICS QT question Jörn Dreyer via Tech-talk
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  <20202021  2022  2023  2024 
ANJ, 24 Sep 2020 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·